Proposed 200MW greenfield data centre development at Kulai, Johor, including street lighting, telco and incoming power infrastructure, temporary power systems, and PV solar farm integration. Scope includes the construction of Hyperscale Data Centre Phase 2 (120MW) and Phase 4 (40MW).